IESCO New Connection
If you’re considering installing an IESCO new connection, for your home or business and want to know the complete process, you’re in the right place. In this article, we’ll provide you with a complete guide on how to install an IESCO new connection for your home or business.
IESCO provides you both the facility that you can get your new IESCO connection installed online or offline (physically office visit). Both the methods are easy and streamlined so that IESCO consumers can get their new connection installed without any hassle.
If want to check your IESCO Online bill, our website provide you this facility free of cost.
IESCO New Connection Process
Follow the steps below to apply for a new IESCO connection,
Documents Required For New Connection Application
Below is a list of all the documents required for an IESCO new connection application.
Process After Online Application Submission
Once your online application for IESCO new connection is submitted, follow the steps below,
If you have any confusion during this process, feel free to contact helpline for guidance.
IESCO New Connection Demand Notice Fee
The fee details for the IESCO new concession demand notice are listed below. Please note that this fee amount changes from time to time, so the exact fee is the one that IESCO issues to you in a demand notice after conducting a site survey. IESCO allows various methods for paying this fee, such as through a bank, e-wallets, and cash payments.
The IESCO has a structure for Tariffs A1 and A2 that determine the prices for new connections based on the length and type of WAPDA meter.
Single Phase Meter:
The fee charges for a single-phase meter connection are listed below, which account for the different lengths.
Three Phase Meter:
The fee charges for a three-phase meter connection are listed below, which account for the different lengths.
Any service lines that are longer than 40 meters would incur additional expenses according to the Chief Engineer of IESCO’s specifications for LT poles and related materials.
How To Check New Connection Application Status
Once you have paid your demand notice fee, you can also check the status of your new connection application online. Click the button below to check the status.
You can track your IESCO new connection application using your reference number or your CNIC.
Estimated Time For IESCO New Connation Installation
The estimated time for new connection installation depends on the category or may be longer. IESCO has created different load categories for the installation of new connections.
Category 1 (Up to 15 kW):
Category 1 is ideal for domestic or small commercial use, including homes, small shops, offices, etc. Below is a timeline Category 1 has for the entire process.
| Steps | Procedure | Days |
|---|---|---|
| 1 | Please attach all necessary documents to the online application form (ENC). | 1 day |
| 2 | Pint all of the documents, compile them into a file, and submit it to the IESCO subdivision office for final approval. | 1 day |
| 3 | The relevant officer will arrange for a site survey and document verification after your application is granted. | 4 days |
| 4 | The new connection demand notice will be generated by IESCO after the survey is finished processing your application. | 4 days |
| 5 | You will be notified by SMS that “Your Demand Notice 2025 is ready” after processing is complete. You can pay at the bank once you print. | 1 day |
| 6 | Attach the paid demand notice with a wiring test report. | 1 day |
| 7 | Your application status can be tracked after payment. | 20–30 days |
| 8 | Connection order Issuance. | 5 days |
| 9 | Your meter is set up by the IESCO storekeeper. | 10 days |
| 10 | Installation of the meter at your location is the last stage. | 1 day |
Total estimated time for category 1 is 48 days.
Category-2 (16kw to 70 kW/400 Volts):
The process for securing a Category-2 IESCO connection is nearly same to that for Category-1. However, due to additional verification and processing requirements, the installation could take up to 68 days to finish.
Category-3 (71kW to 500kW/400 Volts):
The steps for obtaining a Category-3 IESCO new connection are the same as those for Category-1 and Category-2. However, because to the increased load capacity and additional permissions, the installation process could take up to 100 days from the moment the application is submitted.